Hottest Day in Millstreet Since 1976!

Yes, Thursday 28th June 2018 was officially the hottest day in Ireland … including Millstreet … since 1976.  And believe it or not but today (Friday, 29th June 2018) is beginning to look like it’s going to even surpass this with in-car temperatures displaying 33 and 34 degrees centigrade!  We shall certainly be referring in the future to the Long Hot Summer of 2018!  The following sixteen images records Thursday as we experienced it in Millstreet Town, at the Boeing near the River Blackwater in Dooneen,  Millstreet Railway Station, the River Finnow at Dooneen … and ending with a glorious sunset to which we have grown accustomed during this rare summer weather.  We noted the tar melting on roads and how warm it looked along the rail tracks.  Click on the many images to enlarge.  (S.R.)

Clara as viewed from the River Finnow at Dooneen on our hottest day.
The River Blackwater at the Boeing where water safety is a priority.
Temperatures in excess of 30 degrees centigrade at Main Street.
Pat and John Randles amazed at the heat of a wall in Clara Road following a day of brilliant sunshine.
An Post delivers and collects the post on our hottest day.
Even the cyclists take a break!

We’ve been truly blessed with magnificent sunsets over the past week.

[read more …] “Hottest Day in Millstreet Since 1976!”

Work Progressing on the Beara/Breifne Bridge at the Boeing

Work has been progressing this last week on the new pedestrian, cycling and wheelchair access bridge over the Blackwater at the Boeing, at the exact location where Donal O’Sullivan Beara and a thousand of his people and soldiers crossed the river Blackwater in 1603, as they fled the forces of Elizabeth 1st who had . The bridge is one of the final links to the The Beara Breifne Way which stretches from West Cork to Cavan. Thanks to Michelle, and also to Tom from TMC Photography for the photos.

2015-10-08 Ground work begins for the bridge over the Boeing 11 2015-10-08 Ground work begins for the bridge over the Boeing 01

More photos below [read more …] “Work Progressing on the Beara/Breifne Bridge at the Boeing”